Email
info@farazintco.com
Tel
+98 26 3444 7470
+989921474937
Tel/Fax
+98 26 3444 7470 (Ext. 102)
Home
About Us
Activity
Electricity trading through bilateral power purchase agreements (PPAs)
Design, Supply, Installation and Commissioning of Small-Scale Power Plants
Design, Supply, Installation and Commissioning of Renewable Power Plants
Design, Supply, Installation and Commissioning of Fiber Optic Transmission Systems
Design, Supply, Installation and Commissioning of Lighting and Video Surveillance Systems
Design, Supply, Installation and Commissioning of Telecommunication Towers and High Mast Lighting To
Projects
Renewable Power Plant
Fiber optics and telecommunication towers
lighting and Video Surveillance
Certificates
news
Image gallery
Image gallery of renewable energy power plant projects
Image gallery of communication projects
Image gallery of lighting projects
contact us
Home
news
Forward Contract
2026/10/12
Forward Contract
[Private Sector Claims Against the Government Reach 500 Trillion Tomans: Iran’s Power Industry Awaits Liquidity](https://farazintco.com/fa/news16.aspx
2026/07/10
[Private Sector Claims Against the Government Reach 500 Trillion Tomans: Iran’s Power Industry Awaits Liquidity](https://farazintco.com/fa/news16.aspx)
Germany Turns Electric Vehicles into “Mobile Power Plants
2026/10/4
Germany Turns Electric Vehicles into “Mobile Power Plants
Installation and setup of security, monitoring, lighting, network, and CCTV systems for the Assaluyeh site and the Parsian Sepehr Refinery project.
1404/03/18
Construction of a 3 MW power plant in Zarandiyeh city.
1404/03/18
Construction of a 7 MW power plant in Arak
1404/04/10
Operation of the fiber optic network in the Pars Gostar Neyzar Industrial Town
1404/03/18
Manufacturing, production, and installation of the required metal stands for project NGL3100.
1404/03/18
A 12-meter-high tower with an electric elevator
1404/03/18
Supply and installation of a 12-meter light tower with an electric hoist